Commercial shade
Centre-pole patio and market umbrellas for hotels, terraces and pool decks. Specified per project.
Nineteen years making umbrellas. 15,000 ㎡, eight automated lines, 300,000 pcs a month — cut, printed and packed on our own floor.
15,000 ㎡ in Haicang, Xiamen. Cutting, sewing, printing and packing under one roof — so the dye lot, the screen and the pattern stay the same between orders. No trading layer between you and the machine.
Four gates on every order, twelve checks on the line. Nothing leaves the building on the strength of a promise — it leaves on the strength of a record you can ask for by number.
| Gate | What happens | Where |
|---|---|---|
| 01 · Incoming material | Fabric weight, colour against the approved swatch, frame gauge, runner and spring | Material store |
| 02 · In-process patrol | Panel alignment, stitch density, rib seating and print position, checked every two hours | Cutting and sewing |
| 03 · 100% final inspection | Every umbrella opened and closed 500 times, canopy and shaft checked by hand | Inspection bench |
| 04 · Pre-shipment | Carton count, drop test on a sample, packing list matched against the order | Packing area |
The sample room has its own cutter and printer inside the same building as the production floor. What you approve is built on the machines that will run the bulk — not on a bench kept aside for samples.
50 models across three ranges — commercial shade, golf and promotional, and 40 folding, straight and kids models. Every one is produced in-house, so a mixed container is normal, not an exception.
Centre-pole patio and market umbrellas for hotels, terraces and pool decks. Specified per project.
Forty folding, straight, kids and hat models with item numbers, packing and MOQ.
Wide-canopy golf umbrellas in wooden-shaft and EVA-handle versions, printed to six colours.
The clock starts when the deposit clears and the artwork is locked — not when the enquiry arrives. Those are the only two things on your side of the calendar.
| Route | Lead time | What starts the clock |
|---|---|---|
| Standard production | 25–30 days | Deposit received and artwork approved |
| Rush order | 15 days | Confirmed at order, subject to line capacity |
| Stock models | 3–5 days | Payment confirmation |
| Peak season, March to June | Up to 40 days | Book the slot in advance, not on enquiry |
| Loading | FOB Xiamen | Mixed container across models and colours is normal |
If something is missing, ask — we would rather tell you we cannot do it than quote you and find out later.